Your Tax Dollars at Work - North Bend Road Construction Projects

Orchard Street - Healy Ave to SE 5th St 07/2009
This project will construct sidewalk, curb, and a landscaped strip along the north side of Orchard Street.
http://www.tib.wa.gov/projects/ProjectDetail.cfm?npid=P-P-804(P07)-1

Downing Avenue Extension 05/2010
This project constructs a new segment of Downing Avenue between North Bend Way and Second Avenue. The roadway section includes two travel lanes, sidewalks, and planter strips.
http://www.tib.wa.gov/projects/ProjectDetail.cfm?npid=6-P-804(007)-1

Downtown ADA Retrofit 05/2010
Sydney Ave to Ballarat Ave
This project will correct the 40 identified deficient ADA ramps in downtown North Bend along Second, Third, Fourth, and Park Streets. Also, the power poles will be relocated to provide proper clearance.
http://www.tib.wa.gov/projects/ProjectDetail.cfm?npid=P-P-804(P08)-1